Territorial scoring · Geospatial intelligence · Data and product framing

Make the territory readable, so decisions come faster.

I help local government, climate tech companies and infrastructure operators work out where to act and where to deploy: written criteria, dated sources, and enough to hold up in front of a council as well as an investment committee.

20 years in data and geospatial · Public sector and SaaS scale-up · First deliverables in 2 to 6 weeks

Lyon metropolitan area

Territorial scoring map with priority zones ranked from 0 to 100

Lyon proof of concept, 2,009 zones scored · IGN BD TOPO base layer · criteria weighted 25, 25, 30, 20.

This score replaces no decision you already make. It makes those decisions explicit and shareable.

Data does not remove the risk. It lets you choose which one you take.

Three pieces of work, sourced figures

Geothermal scoring, Lyon

2 009

zones scored from 0 to 100

Urban geothermal deployment · Climate tech

Around ten multi-site prospects identified in Priority zones, across Lyon. Deliverables in the format of an investor pitch.

2026 proof of concept, open data

Climate techScoring 0–100
Map output of scored zones

3 700

zones scored for more than 20 networks, on a long-running engagement

Modern data stack & industrialised scoring

Data function built from nothing: stack installed and coded (Fivetran, BigQuery, dbt, Dagster orchestration), team grown from 0 to 7 fully remote, product framed, then scoring industrialised. Still running.

Data stackLong-running engagement
SIRENE retail vitality

Street by street

retail fragility analysed across Lyon

Retail vitality · Local government

Seeing which streets are slipping. An output format that quickly surfaces the micro-areas needing an action plan or further fieldwork.

SIRENE 2022-2026

SIRENELocal government

Frame, arbitrate, put in order

See the page →

Three bounded engagements, each with its own deliverable.

  • Product framing before a project starts
  • Data function audit and roadmap
  • One-off support on an architecture or backlog decision

Where I have held this role

A B2B SaaS scale-up in retail

Product owner for the product: framing with business users, backlog prioritisation, specifications and acceptance criteria, user testing, then measuring real usage once in production. This is where I spent most of my time in this role.

A second product, still in development

Same role, on a product still being built and not public at this stage. I am glad to talk it through in person, within what I am free to say.

Two local authorities · working WebGIS

On both projects I held the role without the title: framing the interfaces, arbitrating features, back and forth with the staff who use them, through to going live.

Where to start

Start small, decide fast.

Each can be commissioned on its own, and none of them prejudges what comes next.

From €1,200 excl. VAT

Territorial data framing workshop

An inventory of the data available and of the gaps, three priority use cases ranked, a summary note with an effort estimate.

From €2,400 excl. VAT

Critical review of deployment criteria

Audit of the existing grid, go and no-go criteria rewritten and weighted, a summary note, one investment committee slide.

From €4,800 excl. VAT

Starter territorial scoring, one perimeter

A weighted criteria grid built together in a workshop, zones scored from 0 to 100, an interactive map delivered, ten to fifteen priority zones with their justification, one summary slide.

The profile

20+ years at the crossing of territory, data, product and high-stakes decisions

I am a geographer by training, with 20 years of experience across local government, consulting and startups. My natural role today is architect, Head of Geospatial Data: I design data systems, I help prioritise the right uses, and I am the link between technical teams and decision-makers.

  • Team leadership : recruitment, skills development and management of a multidisciplinary data team (data engineers, analysts, developers, UX/UI designers, digital marketing), from the first hire to 7 people.
  • Product Owner / Product Manager : a role held on a B2B SaaS product and on two working WebGIS for local authorities. I frame the screens with business users and arbitrate the features; I do not design them. Writing epics and user stories, acceptance criteria, user testing, then measuring real usage once in production. I carry the product vision as much as the data that feeds it.
  • Strategic interface : translating technical stakes for founders, investment committees and elected officials, and the other way round.
  • Applied AI : everyday use of LLMs to speed up data exploration, interface prototyping and deliverable production, without ever letting them stand in for judgement.
2015 →

Founder · GeoQriosity

Territorial scoring, investor proofs of concept, data stack. Energy transition, infrastructure, local government. Fully remote.

2021 →

Head of Data, Product & Geospatial Strategy · SaaS B2B

Founding data hire. Team leadership from 0 to 7 people, Product Owner hat on the working map interfaces. MDS from scratch · 3,700 deployment zones prioritised · more than 20 networks.

2004 → 14

Head of the Territorial Observatory · Urban Community

Multi-source territorial analysis informing infrastructure and housing investment decisions, in the tens of millions of euros.

Education

Master’s in Geography & Regional Planning

University of Dijon · Urban planning · Climatology · Environmental systems.

JH

Jérôme Hippolyte

Founder · GeoQriosity

"I lead data teams, I carry the product vision of the tools they build, and I turn complex spatial analysis into decisions that can be defended: in front of a board, investors, or elected officials."

Team leadership 0→7 Product Owner Scoring territorial dbt · BigQuery · PostGIS FR / EN / ES

A territorial decision to make?

Talk through your deployment questions.

30 minutes to frame your question, identify the data available and see whether scoring makes sense for you. No commitment.

Better decisions, faster, with less risk taken blind.

Book 30 min Write